How much is manual work costing your team?
Data entry, copying contacts between tools, sending updates by hand. Put in your team size, revenue and the hours each person spends on it, and see what that time is worth a year.
The math, in plain words
First we work out what an hour of your team's time brings in: annual revenue divided by people, working weeks and a 40-hour week.
Then we multiply that by the manual hours your whole team spends each year. That's the revenue capacity going into work a system could do.
Nothing here is a benchmark. Every number is yours.
About this calculator
What counts as manual work?
Anything a person does by hand that a connected system could do: entering the same contact in two tools, sending routine check-ins, updating a spreadsheet after every showing or tour, chasing documents.
Is this money I am losing?
It's revenue capacity. It shows what those hours are worth at your team's average revenue per working hour. Getting the hours back doesn't put cash in the bank by itself; it frees people to do the work that does.
Does it work for commercial brokerages?
Yes. Switch to Commercial and use annual fee revenue instead of GCI.
Manual Work Cost Calculator
How much revenue capacity your team spends on manual work: data entry, copying contacts between tools, sending updates by hand.
Run your numbers →Follow-upFollow-Up Leak Calculator
How much commission slips away from leads that never get a second or third follow-up.
Run your numbers →CoverageAgent Coverage Calculator
How many follow-ups go unsent when agents or brokers are sick, on vacation, or buried in a closing.
Run your numbers →Old leadsDead Lead Revival Calculator
What the old leads sitting in your CRM could be worth if each one got a single, well-timed check-in.
Run your numbers →